More than half NHS Scotland buildings not checked for Raac- QHN



Of 254 NHS buildings at risk of containing the material, 97 have been inspected by specialist engineers.

Note:- (Not all news on the site expresses the point of view of the site, but we transmit this news automatically and translate it through programmatic technology on the site and not from a human editor. The content is auto-generated from a syndicated feed.))